Volume 5, Issue 2, April 2020, Page: 20-34
Evaluating Contractors’ Capacity Based on Safety Record and Performance of Road Construction Infrastructural Projects
James Mushori, Project Planning and Management, University of Nairobi, Nairobi City, Kenya
Charles Mallans Rambo, School of Open and Distance Learning, University of Nairobi, Nairobi City, Kenya
Charles Misiko Wafula, School of Open and Distance Learning, University of Nairobi, Nairobi City, Kenya
Received: Dec. 5, 2019;       Accepted: Mar. 11, 2020;       Published: Apr. 8, 2020
DOI: 10.11648/j.jccee.20200502.11      View  106      Downloads  49
Abstract
A number of studies conducted in Kenya and internationally indicate that most of the construction firms and contractors do not seem to strictly observe safety administration in construction industry, hence compromised performance at implementation stage of projects and even later in the post-delivery stage. The study aimed to examine the influence of contractors’ safety record on road performance. This is to create better understanding of how the safety record of contractors could either positively or negatively influence performance of roads during post-delivery stage. The study used both descriptive survey research design and correlation design based on a pragmatic mixed method approach. Through stratified sampling and proportionate sampling, a sample of 210 was drawn from a population of 460 comprising of registered contractors and Public Service Vehicles (PSV) drivers within Nairobi County in Kenya. Questionnaires were distributed using simple random sampling. The questionnaires returned were 153 in total representing 72.8% of all questionnaires distributed to the respondents. Data was descriptively analyzed using percentages, frequencies, means and standard deviations for measuring central tendency and variability. Inferential analysis was done by use of correlation and regression. The descriptive analysis revealed that safety policy management system, insurance policy, and adequacy of standards in addressing safety outcome are to some extent practiced and adhered to. However, compliance behavior to safety procedures is still weak and requires improvement. The null hypothesis was tested and the results obtained from a simple linear regression indicated that, R=0.657, R2=0.431, B=0.359, t=10.703, F (1,151)=114.558, p=0.000< 0.05. This means that contractors’ safety record has a strong positive and significant relationship with road performance and that 43.1% of variation in performance is explained by safety record. This study recommends that contractors’ safety record should part and parcel of the evaluation criteria used in selection of a suitable road contractor to ensure road performance is achieved even after construction is completed. The study is significant in that it contributes to the body of knowledge by providing empirical data on the need for safety procedures in urban road construction and beyond.
Keywords
Contractors’ Safety Record, Road Performance, Road Safety, Infrastructural Projects
To cite this article
James Mushori, Charles Mallans Rambo, Charles Misiko Wafula, Evaluating Contractors’ Capacity Based on Safety Record and Performance of Road Construction Infrastructural Projects, Journal of Civil, Construction and Environmental Engineering. Vol. 5, No. 2, 2020, pp. 20-34. doi: 10.11648/j.jccee.20200502.11
Copyright
Copyright © 2020 Authors retain the copyright of this article.
This article is an open access article distributed under the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0/) which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Reference
[1]
Wegman, F (2016) The future of road safety: A worldwide perspective, International Association of Traffic and Safety Sciences, 40 (2017), 66-71 https://doi.org/10.1016/j.iatssr.2016.05.003.
[2]
United Nations (2018) Road Safety Performance Review Uganda Retrived on 15/12/209, from: https://www.unece.org/fileadmin/DAM/road_Safety/Documents/RSPR_Uganda_February_2018/Ugand a_Road_Safety_Performance_Review_Report_web_version.pdf.
[3]
Australian Government (2012) A Systematic Review of the Effectiveness of Safety Management Systems Commonwealth of Australia Retrieved from: https://www.atsb.gov.au/media/4053559/xr2011002_final.pdf.
[4]
IFC (2017) Managing Contractors’ Environmental and Social Performance World Bank International Finance Corporation: Washington DC.
[5]
Emeasoba, U R., & Ogbuefi, J U (2013) Sustainable socio-economic development in Nigeria: a case for road infrastructure maintenance Journal of Environment and Earth Science, 3 (5): 129–137 ISSN 2224-3216 (Paper) ISSN 2225-0948 (Online).
[6]
Ogendi, J., Odero, W., Mitullah, W & Khayesi, M (2013) Pattern of Pedestrian Injuries in the City of Nairobi: Implications for Urban Safety Planning Journal of Urban Health, 90 (5): 849-856 doi: 10.1007/s11524-013-9789-8.
[7]
Griffin, M. A & Neal, A (2000) Perceptions of safety at work: a framework for linking safety climate to safety performance, knowledge, and motivation Journal of Occupational Health Psychology, 5: 347-358 DOI: 10.1037//1076-8998.5.3.347.
[8]
Manyara, C. G (2013) Combating road Traffic in Kenya: A challenge for Emerging Economy KESSA Proceedings 2013 DOI: 10.1057/9781137574633_7.
[9]
Feng, Y (2013) Effects of Safety Investments on Safety Performance of Building Projects Safety Science, 59: 28-45 https://doi.org/10.1016/j.ssci.2013.04.004.
[10]
Kahongeh, J (2019) The death trap that is Nairobi’s Outer Ring Road Daily Nation, Friday November 15, 2019 (Online) Retrieved on 11/12/2019 from: https://www.nation.co.ke/news/-death-trap-Nairobi-Outer-Ring-Road/1056-5349964-2p89w9z/index.html.
[11]
Nairobi City County Government (NCCG) (2015) Non Motorized Transport Policy: Towards NMT as the Mode of Choice Nairobi City County Government Nairobi City County Retrieved from: https://www.kara.or.ke/Nairobi%20City%20County%20Non%20Motorized%20Transport%20Pol icy.pdf.
[12]
Kinyanjui, M (2018) Weed Out Incompetent Contractors, PS Korir Tells Sonko on Poor Roads Retrieved from: https://www.the-star.co.ke/news/2018/05/10/weed-out-incompetent-contractors-ps-korir-tells-sonko-on-poor-roads_c1756529.Accesed 11/6/2018.
[13]
Hall, M & Holt, R (2003) Developing a Culture of Performance Learning in U. K Public Sector Project Management Public Performance & Management Review 26 (3): 263-275 Retrieved from: https://www.tandfonline.com/doi/abs/10.1177/1530957602250230.
[14]
Heinrich, H. W., Peterson, D & Roos, N (1980) Industrial Accident Prevention (5th Edition) McGraw Hill: New York.
[15]
Koehn, E., Kothari, R. K & Pan, C-S (1995) Safety in developing countries: Professional and bureaucratic problems Journal of Construction Engineering Management, 121: 261-265. DOI: 10.1061/(asce)0733-9364 (1995)121: 3 (261).
[16]
Kartam, N. A & Bouz, R. G (1998) Fatalities and Injuries in the Kuwaiti Construction Industry Accident, Analysis and Prevention, 30 (6): 805-814 DOI: 10.1016/s0001-4575 (98)00033-5.
[17]
O’Toole, M (2002) The Relationship between Employees’ Perceptions of Safety and Organizational Culture Journal of Safety Research, 33 (2002): 231-243 Retrieved from: http://158.132.155.107/posh97/private/culture/relationship-Toole.pdf.
[18]
Weil, D (2001) Assessing OSHA Performance: New Evidence from the Construction Industry Journal of Policy Analysis and Management, 20 (4): 651-674 Retrieved from: http://www.fissuredworkplace.net/assets/Weil.AssessingOSHAConstruction.JPAM.2001.pdf.
[19]
Diugwu, I. A., Baba, D. L & Egila, A. E (2012) Effective Regulation and Level of Awareness: An Expose of the Nigerian’s Construction Industry Open Journal of Safety and Technology, 2: 140-146 DOI: 10.4236/ojsst.2012.24018.
[20]
Ngacho, C & Das, D (2014) A performance evaluation framework of development projects: an empirical study of Constituency Development Fund (CDF) construction Projects in Kenya International Journal of Project Management, 32: 492-507 https://doi.org/10.1016/j.ijproman.2013.07.005.
[21]
Alzahrani, J. I & Emsley, M. W (2013) The impact of contractors’ attributes on construction project success: a post construction evaluation International Journal of Project Management, 31: 313-322 doi: 10.1016/j.ijproman.2012.06.006.
[22]
Jannadi, O & Bu-Khamsin, M (2002) Satety factors considered by industrial contractors in Saudi Arabia Building and Environment, 37: 539-547 DOI: 10.1016/S0360-1323 (01)00056-7.
[23]
Hosseinian, S. S & Torghabeh, Z J (2012) Major Theories of Construction Accident Causation Models: A Literature Review International Journal of Advances in Engineering & Technology Retrieved from: http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.668.8949&rep=rep1&type=pdf.
[24]
Sabet, P. G. P., Aadal, H., Jamshidi, M. H. M & Rad, K. G (2013) Application of Domino Theory to Justify and Prevent Accident Occurrence in Construction Sites Journal of Mechanical and Civil Engineering (IOSR-JMCE), 6 (2): 72-76 Retrieved from: http://www.iosrjournals.org/iosr-jmce/papers/vol6-issue2/I0627276.pdf.
[25]
Mahat, N. A. A., Ismail, F & Alwee, S. N. A. S (2015) Integration of Quality Management and Construction Accident Causation: Development of Accident Causation Theories Australian Journal of Accident Basic and Applied Sciences, 9 (22): 123-129. Retrievedfrom: http://www.ajbasweb.com/old/ajbas/2015/Special%20IPN%20Langkawi%20 (June)/123-129.pdf.
[26]
Johnson, R. B & Onwuegbuzie, A J (2004) Mixed methods Research: A Research paradigm Who Time has Come Educational Researcher, 3397): 14-26 http://dx.doi.org/10.3102/0013189X033007014.
[27]
Greenfield, R & Morgan, M. J. W (2014) Management of Health and Safety Performance of Facilities Management Hertfordshire, UK: British Institute of Facilities Management.
[28]
Bernard, H. R (2000) Social Research Methods: Qualitative and Quantitative Approaches Thousand Oaks, California: Sage Publications.
[29]
Cooper, D. R & Schindler, P. S (2006) Business Research Methods Business Research Methods (9th Edition) New York: McGraw-Hill.
[30]
Enshassi, A Mohamed, S & Abushaban, S (2009) Factors Affecting the Performance of Construction Projects in the Gaza Strip Journal of Civil Engineering and Management, 15 (3): 269-280 Retrieved from: DOI: 10.3846/1392-3730.2009.15.269-280.
[31]
Nyangwara, P. O & Datche, E (2015) Factors Affecting the Performance of Construction Projects: A Survey of Construction Projects in the Coastal Region of Kenya International Journal of Scientific and Research Publications, 5 (10): 1-43 Retrieved from: http://www.ijsrp.org/research-paper-1015/ijsrp-p46121.pdf.
[32]
Saunders, M., Lewis, P & Thornhill, A (2009) Research Methods for Business Students New York: Pearson.
[33]
Mugenda, A G & Mugenda, O (2003) Research methods: Quantitative and Qualitative Approach Nairobi: ACTS Press.
[34]
De Saram, D. D & Tang, S. L (2005) Pain and suffering costs of persons in construction Accidents: Hong Kong experience Construction Management Economics, 23: 645-658 https://doi.org/10.1080/01446190500039739.
Browse journals by subject