This thesis is to identify and evaluate effective delivery methods and assess their applicability to the local situations in the Oromia region of the West Wallaga Zone. The significance of the research is that the broadening of the service packages is believed to enable the optimization of the process and the product as a whole in the construction industry, as well as facilitate the development of the infrastructure sectors. The objective of this research is to identify effective project delivery methods for public works construction in the Oromia Region West Wallaga Zone. The data collection process used in the research had the option of two basic methods: primary data collection and secondary data collection. Accordingly, four project delivery methods based on their relevance to the local situation have been evaluated; their merits, demerits, and requirements have been identified. These methods are: the design-bid-build, construction managers (at resk and at fee), the design-build, and the design-build-operate-transfer methods. Based on these findings of the study, the design-bid-Build method has been the most widely used effective project delivery method in the Oromia Region West Wallaga Zone. Performance-based project delivery methods are thought to offer a way to develop the sector and to benefit all stakeholders. In order to benefit all parties involved in the building sector, this will serve as a beneficial addition to the current techniques.
Published in | Journal of Civil, Construction and Environmental Engineering (Volume 9, Issue 4) |
DOI | 10.11648/j.jccee.20240904.13 |
Page(s) | 115-121 |
Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
Copyright |
Copyright © The Author(s), 2024. Published by Science Publishing Group |
Construction Industry, Delivery Method, Design-Bid-Build, Design-Build, Construction Management, Design-Build-Operate-Transfer
[1] | A. A. Science, “Addis Ababa Science and Technology University College of Architecture and Civil Engineering Department of Civil Engineering,” pp. 5–6, 2020. |
[2] | S. T. Tamur and K. R. Erzaij, “The effectiveness of project delivery systems in the optimal implementation of green buildings,” IOP Conf. Ser. Mater. Sci. Eng., vol. 1105, no. 1, p. 012099, 2021, |
[3] | Habtamu, “Alternative and Innovative Project Delivery System for Addis Ababa City Road Projects a Master ’ S Thesis By College of Architecture and Civil Engineering Addis Ababa Science and Technology,” no. May, pp. 1–116, 2019. |
[4] | H. Pour, M. Ghayem, and A. K. Ghasr, “Using overlapping fields in design- build assignments to retrieve the architectonic situation in architecture schools,” vol. 19, no. 3, pp. 651–669, 2022. |
[5] | K. Molenaar, K. Stanton Lewis Professor, B. Franz, and A. Professor, “Revisiting Project Delivery Performance Final Report,” no. Cii, 2018. |
[6] | X. Zhu, X. Meng, and Y. Chen, “A novel decision-making model for selecting a construction project delivery system,” J. Civ. Eng. Manag., vol. 26, no. 7, pp. 635–650, 2020, |
[7] | B. Amade, “Partnering Mechanisms and the Procurement of Building Construction Projects Delivery,” vol. 6, no. 2, pp. 596–620, 2012, [Online]. Available: |
[8] | L. Chen and W. Pan, “Review fuzzy multi-criteria decision-making in construction management using a network approach,” Appl. Soft Comput., vol. 102, pp. 0–50, 2021, |
[9] | A. Karzoun et al., “Modern Construction Lean Project Delivery and Integrated Practices EVALUAT ION OF INT EGRAT ED PROJECT DELIVERY ON T HE PERFORMANCE OF CONST RUCT ION PROJ… Modern Construction Lean Project Delivery and Integrated Practices,” 2011. |
[10] | C. H. Botter, “Project management: A systems approach to planning, scheduling and controlling,” Eur. J. Oper. Res., vol. 10, no. 2, p. 211, 1982, |
[11] | T. B. Environment, E. Asmar, and T. B. Environment, “PERFORMANCE FOR WATER INFRASTRUCTURE CAPITAL aft aft,” 2020. |
APA Style
Merga, C., Keno, M. (2024). Effective Project Delivery Method for Public Construction: Case in the Oromia Region, West Wallaga Zone. Journal of Civil, Construction and Environmental Engineering, 9(4), 115-121. https://doi.org/10.11648/j.jccee.20240904.13
ACS Style
Merga, C.; Keno, M. Effective Project Delivery Method for Public Construction: Case in the Oromia Region, West Wallaga Zone. J. Civ. Constr. Environ. Eng. 2024, 9(4), 115-121. doi: 10.11648/j.jccee.20240904.13
AMA Style
Merga C, Keno M. Effective Project Delivery Method for Public Construction: Case in the Oromia Region, West Wallaga Zone. J Civ Constr Environ Eng. 2024;9(4):115-121. doi: 10.11648/j.jccee.20240904.13
@article{10.11648/j.jccee.20240904.13, author = {Chera Merga and Marema Keno}, title = {Effective Project Delivery Method for Public Construction: Case in the Oromia Region, West Wallaga Zone }, journal = {Journal of Civil, Construction and Environmental Engineering}, volume = {9}, number = {4}, pages = {115-121}, doi = {10.11648/j.jccee.20240904.13}, url = {https://doi.org/10.11648/j.jccee.20240904.13}, eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.jccee.20240904.13}, abstract = {This thesis is to identify and evaluate effective delivery methods and assess their applicability to the local situations in the Oromia region of the West Wallaga Zone. The significance of the research is that the broadening of the service packages is believed to enable the optimization of the process and the product as a whole in the construction industry, as well as facilitate the development of the infrastructure sectors. The objective of this research is to identify effective project delivery methods for public works construction in the Oromia Region West Wallaga Zone. The data collection process used in the research had the option of two basic methods: primary data collection and secondary data collection. Accordingly, four project delivery methods based on their relevance to the local situation have been evaluated; their merits, demerits, and requirements have been identified. These methods are: the design-bid-build, construction managers (at resk and at fee), the design-build, and the design-build-operate-transfer methods. Based on these findings of the study, the design-bid-Build method has been the most widely used effective project delivery method in the Oromia Region West Wallaga Zone. Performance-based project delivery methods are thought to offer a way to develop the sector and to benefit all stakeholders. In order to benefit all parties involved in the building sector, this will serve as a beneficial addition to the current techniques. }, year = {2024} }
TY - JOUR T1 - Effective Project Delivery Method for Public Construction: Case in the Oromia Region, West Wallaga Zone AU - Chera Merga AU - Marema Keno Y1 - 2024/08/27 PY - 2024 N1 - https://doi.org/10.11648/j.jccee.20240904.13 DO - 10.11648/j.jccee.20240904.13 T2 - Journal of Civil, Construction and Environmental Engineering JF - Journal of Civil, Construction and Environmental Engineering JO - Journal of Civil, Construction and Environmental Engineering SP - 115 EP - 121 PB - Science Publishing Group SN - 2637-3890 UR - https://doi.org/10.11648/j.jccee.20240904.13 AB - This thesis is to identify and evaluate effective delivery methods and assess their applicability to the local situations in the Oromia region of the West Wallaga Zone. The significance of the research is that the broadening of the service packages is believed to enable the optimization of the process and the product as a whole in the construction industry, as well as facilitate the development of the infrastructure sectors. The objective of this research is to identify effective project delivery methods for public works construction in the Oromia Region West Wallaga Zone. The data collection process used in the research had the option of two basic methods: primary data collection and secondary data collection. Accordingly, four project delivery methods based on their relevance to the local situation have been evaluated; their merits, demerits, and requirements have been identified. These methods are: the design-bid-build, construction managers (at resk and at fee), the design-build, and the design-build-operate-transfer methods. Based on these findings of the study, the design-bid-Build method has been the most widely used effective project delivery method in the Oromia Region West Wallaga Zone. Performance-based project delivery methods are thought to offer a way to develop the sector and to benefit all stakeholders. In order to benefit all parties involved in the building sector, this will serve as a beneficial addition to the current techniques. VL - 9 IS - 4 ER -